This guide explains what actually goes into a co-packing quote, what moves the number up and down, and how to arrive with the information that gets you a real answer instead of a range.
A co-packer is quoting a run, not a product. The same 2,000 bottles cost different amounts depending on whether the line has to be torn down and sanitised for an allergen beforehand, whether you supplied the bottles or we sourced them, whether the recipe is stable or still moving, and whether this is a one-off or the first of twelve.
Any co-packer publishing a flat per-unit price is either quoting one narrow scenario, or they are going to revise it once they see your spec. The useful question is not “what does it cost” but “what is my quote made of”.
That said, there is a useful starting point, which is knowing what moves the number most. The product comes first: a hot sauce, a ketchup and a pasta sauce are priced very differently, because they use different ingredients and run differently on the line. Container size moves it just as much, so the same recipe in a 150 mL bottle, a 250 mL bottle and a 500 mL jar is three different quotes. After that it is batch size, which matters more than anything else you control. The factors below are what the rest of the quote is built from.
Most quotes decompose into six things.
Ingredients. Either you supply them or the co-packer procures them. Procurement usually costs a little more per unit and saves you an enormous amount of coordination, especially on a first run.
Packaging. Bottles, jars, pouches, closures, labels, cases. This is frequently the largest single line, and it is the one most under your control. Standard formats are cheaper than custom ones, by a lot.
The run itself. Machine time, labour on the line, and the changeover before and after. Changeover is the part people underestimate: cleaning and resetting a line takes roughly the same effort whether the run that follows is small or large.
Quality assurance. In-process checks, batch records, retained samples, and any testing your buyer or your certification requires.
Storage and logistics. Finished goods have to go somewhere. Pallet storage, then freight.
Development, if you need it. Benchtop work, scale-up trials, Nutrition Facts tables and label compliance are usually quoted separately from production.
Your cost per unit is mostly a function of how much of that fixed changeover gets spread across the run.
The ingredients and packaging scale linearly, but the setup, cleandown, QA paperwork and line time barely move. This is why the per-unit price falls sharply between a small first run and a proper production batch, and why the second quote you get is often much better than the first. Not because anyone is discounting, but because the arithmetic changed.
It is also the entire explanation for minimum order quantities.
An MOQ is not a co-packer being difficult. It is the point below which the changeover cost swamps everything else and the run stops making sense for either party. We do not set one at Hummingbird. In practice, a first run with us usually starts somewhere between 100 and 400 kg of product.
Where a co-packer does set an MOQ, it is usually driven by:
If an MOQ is out of reach, it is worth asking which of those four is binding. Sometimes it is the packaging, and a stock bottle solves it.
You will get a faster and much more accurate answer if you arrive with these:
If you cannot answer all six yet, send what you have. Missing pieces are normal on a first inquiry and a decent co-packer will tell you which gaps actually block a quote.
That last one matters more than it sounds. Certifications get claimed loosely in this industry. Ask which ones are current, and ask to see the certificate. Which food certifications actually matter goes through what each one requires.
Headquartered in Burnaby, BC, we co-pack sauces, liquids and dry goods in Western Canada for brands ranging from first retail listings to national programs.
From a signed quote to first fill usually takes three weeks or less. Development work, or packaging that still has to be sourced, can extend that.
It is quoted per project rather than per unit, because the cost is driven by batch size, packaging format and changeover requirements as much as by the product itself. The most useful thing you can do is send a full spec and get a real quote.
The smallest run a co-packer will accept, set by the point at which line changeover, ingredient minimums and packaging minimums stop making a smaller run viable. Packaging is often the binding constraint. Hummingbird does not set one. In practice, a first run with us usually starts somewhere between 100 and 400 kg of product.
Yes, usually substantially. Setup, cleandown and QA are close to fixed per run, so spreading them across more units drops the per-unit cost quickly at first, then levels off.
It can reduce cost if you can meet supplier minimums and store the material. On a first run, most brands are better off having the co-packer procure, because the coordination burden is larger than it looks.
The terms are used interchangeably. In practice, contract manufacturing tends to imply making the product, and co-packing tends to imply filling and packaging it. Most co-packers, including us, do both. Private label versus white label versus co-packing separates the rest of the terms.
Send us the six things above and we will come back within one business day with a quote, not a range. No minimum order, SQF certified, in Western Canada.